12/15/10 Ministry Center Update

Building is happening on the Ministry Center!

 The walls have been framed up and the roof trusses are being installed this week.  The entire building should be sheeted (plywood) and ready for shingles and siding.  We will need to heat the inside of the building so that some plumbing and electrical can be completed.  Then the concrete floor can be poured. 

 Have a great Christmas!

Roger Stroh, Ministry Center Project Manager